Mardi Gras Break
Jason is tying together two walls by attaching a 2x4 that overlaps both walls.
Each treated base board must be secured to the foundation with both anchor bolts and f-26 adhesive.
The house at the end of Monday.
Connection between the mom's bathroom and the main bath. The attic will be located above this wall.
Phill and Steve are moving a pre-framed window into the trailer. A window is framed together on the ground and then secured into place on the studs.
The middle dividing wall is put into place.
Footers are dug out for the front porch slab.
The house at the end of Wednesday.








No comments: