Saturday, March 3, 2012



Quarter Break Part 1
The house at the beginning of the day. Mostly exposed framing.


 The front entrance after sheathing. The OSB is measured and cut to fit the appropriate size then nailed directly into the studs.

Looking above the washroom, Chris is nailing supports for the interior walls. 

View looking towards the drop ceiling for the bathroom

 Chad bravely walks the rafters 

Allen working hard to put up OSB above the window in the kitchen. 