Roofing, Framing, and Sheathing
The last piece of OSB is installed. This particular section was tough because we had to accommodate for two different angles.
Side view showing all three clear story windows and the overhang of the eaves.
The clear story window looking into Ms Hargroves bedroom.
The last section of roof will be covered as soon as the next series of rafters are installed.
The roof felt is nailed in before the metal sheets are secured to the roof.
View from the roof looking at the porch. The form work for the porch is being prepared for the concrete.
The wall, which separates the attic from the hall is notched into the rafters.
This is the frame work for the HVAC duct.
Boards are nailed in between the studs to make a pocket for the spray insulation.